Full Section Bed Ballast Replacement Machine

Full Section Bed Ballast Replacement Machine

Skip to product information
1 of 1
QHC-450
  • Purpose: Designed for railway overhaul and medium repair, focusing on bed ballast replacement.
  • Hydraulic Control: Operated by hydraulic fluid, offering convenient, comfortable operation, low maintenance costs, and high reliability.
  • Ballast Removal and Replacement:
  • Excavation: Removes dirt and ballast without needing to remove track skeletons.
  • Casting: Casts the removed material to either side of the track or to the material conveyor truck using a rotary casting belt that operates at an angle of ±45°.
  • Versatile Casting: Meets various casting requirements for different railways.
View full details